On the evening of June 3, Ideal Automobile announced that a total of 18 Ideal Supercharging Stations will be put into operation from May 27, 2024 to June 2, 2024.
, Photo source: Ideal Car.
It is reported that the 18 supercharging stations are located in Foshan, Dongguan, Suzhou, Lianyungang, Jiaxing, Yulin, Fuzhou, Hefei, Taiyuan, Tianjin, Guangzhou Tanbu Service Area (Haikou direction), Zhongshan West Ring Expressway Henglan Service Area (Zhuhai direction), Ningbo Fenghua Service Area (two-way), Ankang West Service Area (two-way).
According to public information, the high-speed overcharging speed of the ideal 5C overcharging station is 500 kilometers in 12 minutes, and the peak charging power of a single pile can reach 520 kilowatt.
the urban overcharging speed is 500 kilometers in 25 minutes, and the peak charging power of a single pile can reach 250 kilowatt.
In addition, the supercharging station provides efficient energy replenishment of 800V, and its charging gun weighs only 3.3kg. Girls can also lift it.
Low charging noise and large parking space.
, In addition, the parking space of the ideal 5C supercharging station is equipped with an independent camera to automatically complete functions such as vehicle occupancy sensing, automatic landing lock, and safety issue identification and reporting.
the operating status and charging status are automatically transmitted back to the cloud for analysis and exploration by the background.
Potential problem.
As of June 2, 2024, there are 428 ideal overcharging stations and 1896 ideal charging piles across the country, located in 24 provinces and 132 cities.
Currently, the G2 Beijing-Shanghai Expressway, G4 Beijing-Hong Kong-Macao Expressway, G15 Shenyang-Haihai Expressway, and G25 Changzhou-Shenzhen Expressway Hangzhou-Shenzhen Section have been connected to four national-level expressways.
Ideal Automobile officially stated that it will launch more than 2000 supercharging stations and more than 10000 charging piles by the end of 2024.
the planned coverage rate of core Urban area in first-and second-tier cities will exceed 90%.
and the planned mileage coverage rate of national-level expressway trunk lines will exceed 70%.
Return to the first electric network home page>,.